1. Save the estimate
Keep the hours, loaded labor cost, materials and other costs used to build the price.
Enter estimated and actual hours, materials and other costs to see where the job gained or lost margin—and improve the next estimate with evidence instead of memory.
A job can bring in cash and still miss its target. Job costing assigns labor, materials and other direct costs to one job, then compares the estimate with what really happened. The useful question is not only “Did I get paid?” It is “Which number changed, and what should I estimate differently next time?”
Keep the hours, loaded labor cost, materials and other costs used to build the price.
After the job, replace guesses with time records, receipts, invoices and disposal or rental costs.
Find the specific variance—hours, material use or another cost—and update that part of your estimating process.
Add loaded labor cost, materials and the other job costs you assign to the work. Use the same categories before and after the job so the comparison means something.
Job cost = labor + materials + other job costsGross profit is the selling price minus job cost. Gross margin shows that result as a percentage of the selling price.
Gross margin = gross profit ÷ selling priceThe job was priced at $1,600 with 24 labor hours, $260 of materials and $100 of other costs. At a $35 loaded labor cost, the estimated job cost was $1,200 and the expected gross margin was 25%.
The actual job used 28 hours, $310 of materials and $135 of other costs. Actual cost became $1,425, leaving $175 of gross profit and a 10.94% margin. The calculator identifies the $225 overrun; the job notes should explain why it happened.
| Cost area | Estimated | Actual | Variance | Question for next estimate |
|---|---|---|---|---|
| Labor hours | 24 | 28 | +4 hours | Which task or delay used the extra time? |
| Labor cost | $840 | $980 | +$140 | Was setup, travel, prep or cleanup missed? |
| Materials | $260 | $310 | +$50 | Was quantity, waste or a consumable omitted? |
| Other costs | $100 | $135 | +$35 | Did disposal, delivery or equipment change? |
| Total job cost | $1,200 | $1,425 | +$225 | Which estimate assumption needs revision? |
Compare estimated prep and coat hours with actual time, plus paint, masking and consumable use.
Track crew hours, supplies and room or condition differences that changed service time.
Separate installation time from supply runs, hidden conditions, parts and disposal.
Compare planned service hours with access delays, equipment, travel and subcontracted work.
Practical references reviewed: Xero—Construction job costing for small businesses and University of Maine Cooperative Extension—Pricing services for profit.
The result depends on the costs you include. It does not calculate taxes, cash flow, depreciation or contract rights, and it does not replace accounting, tax or legal advice.
The Crown Pro Contractor Quote & Follow-Up Kit includes a working cost-and-margin calculator, scope worksheet, estimate layout, follow-up templates, closeout checklist and project backup.